WHAT WE OFFER
We are Actively involved in the T&D Sector of all electrical arena. We keenly focus in Renewable Energy Power Plants and Farms to promote, encourage, support, appreciate “The Green Farm”.
PCPL has excellent understanding of the local and global market and has the required data and expertise to execute successful “EPC – Turnkey Electrical Projects on the followings.
- Renewable Energy Plants
- Substations & Pooling Substations – Up to 400 KV
- Transmission Lines & Cables - Up to 220 KV
SITE SURVEY
LAND CONTOURING
LAND SCAPING
PV-SYSTEM ANALYSIS
PROCUREMENT - MODULES TO TRANSMISSION LINES & CABLES/POWER EVACUATION ELEMENTS
CIVIL AND ALLIED CIVIL WORKS
MODULE MOUNTING SYSTEM
FIXED AND EAST – WEST TRACKING
TABLE/ARRAY MAKING -MODULES INSTALLATION
STRING COMBINER AND DC SIDE CASCADING
DC INVERTER ERECTION
- DC WIRING
- AC WIRING
AC TRANSFORMER – ERECTION AND WIRING
AC TRANSFORMER BAY WORKS
AC GRID FEED & TRANSMISSION LINES
APPROVALS – TNEB & CEIG
FINAL COMMISSIONING
PERIPHRAL CONNECTIVITY ANALYSES – NEARBY TNEB SUBSTATION ANALYSES
SITE SURVEY
SWITCH YARD DESIGNING
TANGEDCO/ TANTRANSCO/CEIG APPROVAL FOR SWITCH YARD
PROCUREMENT – ALL SWITCHYARD ELECTRICAL &CIVIL MATERIALS
CIVIL FOUNDATON WORKS
EARTHING
STRUCTURE ERECTION
EQUIPMENT ERECTION
STRINGING
EQIPMENT CONNECTION
CABLE LAYING
CABLE TERMINATION
GRAVEL FILLING
EQUIPMENT TESTING
FINAL COMMISSIONING
ROUTE AND DETAIL SURVEY
TL REQUIREMENTS AND QUANTITY ANALYSES
TANTRANSCO & TANGEDCO APPROVAL
CIVIL FOUNDATIONS
TOWER ERECTIONS
CONDUCTOR/LINE STRINGING
TERMINAL CONNECTION (EARTHING AND COMMUNICATION CABLE)
TESTING
FINAL COMMISSIONING
- Industrial Electrifications
- Consultancy & Liasioning
- Cable Projects
Design, Shop Drawings, Supply, Installation And Commissioning Of Industrial Electrification Works.
LT, HT, EHT Panel Erection And Terminations.
LT, HT, EHT Cable Laying.
LT, HT, EHT Cable Termination.
Interior And Exterior Industrial Lighting Works
Complete Earthing Works
Steel And Structure Fabrication
Cable Trays
All Types For All Industries As Per Customers’ Requirements And TNEB Norms
Design
Engineering
Project Concept development
Pre Feasibility & Feasibility Reports
Detailed Project Report
System Studies
Detailed Engineering
Power Evacuation
Load Approval & Sanction
All approvals from State & Central utilities department - CEA & CEIG
Design
Engineering
Procurment
Installation
Testing & Commission
Cable straight through Joint
Cable end termination
WE ALSO MANUFACTURE CABLE CLEATS
Cable Cleats are widely used clamps for cables in Long-run. Cleats club cables together and keep in place as per drawings and requirements.
Powertech Constructions Pvt Ltd., Manufactures Cleats with immense quality (in all Aspects & Dimensions) to satisfy customers requirements and ships all the way to PAN-SOUTH-ASIAN and SOUTH-EAST ASIAN Countries On-the-go without stocking.
Powertech & LT Services